Test Automation

The plugin ships a coherent family of test-automation capabilities: a set of specs that define the discipline, and a layer of skills and agents that develop, run, analyse, and audit tests against those specs. This guide is the map. It explains how the pieces fit together and when to reach for each one; the per-artifact reference lives in the generated Skills and Agents catalog.

Two axes

Test automation here is organised along two orthogonal axes. Keeping them separate is what keeps the family coherent.

  • The pyramid: what to test at which level. A closed, ordered tier taxonomy (static analysis → unit → component → integration → contract → end-to-end) owned by the test-pyramid-foundation spec. Each tier has its own spec and a generator/reviewer agent pair.
  • The cycle: how to develop a test. An iterative determine → execute → analyse → adapt loop (a generalised red-green-refactor) owned by the test-cycle-foundation spec, driven by the test-cycle-orchestrate skill.

A concrete test lives at one tier (the pyramid axis) and is brought into existence through the cycle (the process axis). The cross-cutting capabilities (running the gate and auditing tier completeness) sit across both.

The pyramid: What to test at which tier

The tier taxonomy is closed and ordered. Each functional tier (below static analysis) has a generator agent that scaffolds spec-conformant tests and a reviewer agent that audits existing ones against the tier spec.

Tier Generator agent Reviewer agent Tier spec
Static analysis (lint + typecheck via the gate, no test agent) n/a test-tier-static-analysis
Unit unit-test-generator unit-test-reviewer test-tier-unit
Component component-test-generator component-test-reviewer test-tier-component
Integration integration-test-generator integration-test-reviewer test-tier-integration
Contract contract-test-generator contract-test-reviewer test-tier-contract
End-to-end e2e-test-generator e2e-test-reviewer e2e-test-automation

The end-to-end tier adds e2e-result-reviewer, which inspects a run's screenshots and protocol visually against the requirement and UI specs, a check the other tiers don't need.

To check whether a feature actually covers the tiers it should, run the test-pyramid-check skill: it audits a feature's tier completeness against the test-pyramid-foundation taxonomy and surfaces gaps and the ice-cream-cone anti-pattern.

The cycle: How to develop a test

The test-cycle-orchestrate skill drives the iterative loop. Each phase has a realising spec and, where the work is specialised, an agent. The loop returns from phase 4 to phase 2 (re-execute) and feeds phase 3 back into phase 1 (a discovered defect becomes a new regression case); it terminates only on an explicit exit condition, never by weakening a test to force a pass.

Phase Capability Phase spec
1 · Determine (red) test-case-extractor agent (derives traceable, framework-agnostic cases from a requirement) test-cycle-case-determination, test-case-derivation
2 · Execute quality-gate skill (runs the gate) test-cycle-execution, quality-gate
3 · Analyse test-result-analyzer agent (classifies results into defect / flake / test-bug / infra) test-cycle-result-analysis
4 · Adapt (green) test-code-adapter agent (minimal correct production change under the no-cheating rule) test-cycle-code-adaptation

Running and auditing

Two cross-cutting capabilities apply at every tier:

  • quality-gate (skill) runs the project's lint + typecheck + test gate in parallel and tabulates which checks failed. It's phase 2 of the cycle and the executable form of the static-analysis tier.
  • quality-gate-enforcer (agent) reviews the gate wiring (the Taskfile targets, pre-commit config, CI workflow, and timeouts) for spec conformance, rather than running the gate itself.

End-to-end: Putting it together

A typical pass for a new feature:

  1. Derive cases from the requirement with test-case-extractor (phase 1), then decide which tier each case belongs to using the pyramid taxonomy.
  2. Scaffold the tests at each tier with the matching *-test-generator agent, and have the *-test-reviewer agent audit them.
  3. Run the suite through the quality-gate skill (phase 2).
  4. Analyse failures with test-result-analyzer, plus e2e-result-reviewer for E2E runs (phase 3).
  5. Adapt the production code with test-code-adapter under the no-cheating rule, then re-execute (phase 4 → phase 2).
  6. Audit completeness with test-pyramid-check before the feature is considered done.

test-cycle-orchestrate ties phases 1–4 into the iterative loop so the steps above run as one disciplined cycle rather than ad-hoc.

Reference

  • Per-skill pages in the Skills catalog: quality-gate, test-pyramid-check, test-cycle-orchestrate.
  • Per-agent pages in the Agents catalog: the tier generator/reviewer pairs and the cycle agents.
  • The governing specs live under spec/project/ (test-pyramid-foundation, test-cycle-foundation, the per-tier and per-phase specs).